Solara Villas
Where luxury meets nature in a modern setting — tomorrow's legacy.
Minutes from the beachfront, SEVEN entertainment, INFINITI, Al-Moosa Park & Al-Jawhara Mall — 3 minutes to Almoosa Specialist Hospital, Yamamah University Medical College & the British International School. · Al-Ahsa
- Starting from
- 2,450,000 SAR
- Units
- 24
- sqm total
- 12,500
- Progress
- 38%
- Handover
- 30 Jun 2027
Overview
Overview
Where luxury meets nature in a modern setting — tomorrow's legacy.
Beaban's real estate development spans over 50 years, deeply rooted like the tree symbolized in the design of our showcase villa. Just as a strong tree grows from solid and interconnected roots, every detail of Solara Villas has been meticulously crafted with a foundation of strength, quality, and durability. Built with a strict focus on private living — much like building your own residence — these villas adhere to the highest specifications of the new Saudi Building Code while showcasing premium materials and meticulous craftsmanship. In this project, natural elements are carefully selected for every intricate detail, ranging from marble stairs, cobble-stone flooring, brick walls, leather doors, and natural wood interiors — providing a real and exquisite living experience.
The opportunity
Project Highlights
Starting price
2,450,000 SAR
Availability
Limited Units Available
Project status
In progress
Payment plan
20% Down Payment · 40% During Construction · 40% on Handover
Unit types
| Unit types | Area | Price | Availability |
|---|---|---|---|
| 4-Bedroom Villa | 380 sqm | 2,450,000 SAR | Available |
| 5-Bedroom Villa | 450 sqm | 2,950,000 SAR | Reservation |
| 6-Bedroom + Majlis | 520 sqm | 3,650,000 SAR | Reservation |
Features
Features
- Insulated walls
- Treated glazing
- Studied natural lighting
- 1.5 m engineered soil replacement
- 525 m² built-up area
- Outdoor spaces
- Indoor garden
- Security systems
- Central air conditioning
- Smart home
- Car garage
- Gulf Insulation warranty
- Natural stone facades
- Al-Zamil water tanks
- Fully integrated kitchen
Construction journey
Construction timeline
Construction journey
Overall project progress
38%
5 / 16 Stages
Last updated 19 Jun 2026
Stage 06 / 16
Plumbing Works
Fresh-water and drainage networks, swimming-pool rough-in, and Al-Zamil water tank connections.
- Started
- 1 Jun 2026
- Completed
- —
By the numbers
Live project statistics
Total stages
16
Completed stages
5
Progress
38%
Active stage
Plumbing Works
Documented photos
13
Videos
0
Last update
19 Jun 2026
Gallery
Photo gallery
Documents
Documents & files
Location